City of Gainesville Streatery
- Project Owner: City of Gainesville
- Location: Gainesville FL
Preserving the Path to Main Street Meets & Eats
The City of Gainesville partnered with Scorpio for the Downtown Streatery Project; a streetscape and infrastructure redevelopment initiative that converted SW First Avenue between South Main Street and SW Second Street into a curbless, pedestrian-oriented corridor. The project included full roadway reconstruction, underground utility upgrades, stormwater system enhancements, ADA-compliant brick paver installation, raised intersections, retractable bollards, decorative lighting systems, landscaping, and public-space amenities designed to support increased pedestrian activity and year-round event programming.
Funded through the Gainesville Community Reinvestment Area (GCRA), the City of Gainesville, and local gas tax revenues, this project integrated historic material preservation with modern urban design, including the salvage and reuse of existing brick and granite elements. The space provided flexible event infrastructure, expanded outdoor dining, and a durable, multimodal public realm that supports economic development, downtown activation, and long-term community use.